Skip to content

reboot wit-bindgen-go #3421

reboot wit-bindgen-go

reboot wit-bindgen-go #3421

Re-run triggered December 5, 2025 18:45
Status Cancelled
Total duration 1m 12s
Artifacts 5

main.yml

on: pull_request
Matrix: Build wit-bindgen
Matrix: Test
Test Async (allowed to fail)
1m 47s
Test Async (allowed to fail)
Record the result of testing and building steps
2s
Record the result of testing and building steps
Fit to window
Zoom out
Zoom in

Annotations

5 errors
verify-publish
Canceling since a higher priority waiting request for CI-refs/pull/1447/merge exists
verify-publish
The operation was canceled.
CI
Canceling since a higher priority waiting request for CI-refs/pull/1447/merge exists
Record the result of testing and building steps
Process completed with exit code 1.
Record the result of testing and building steps
Process completed with exit code 1.